Ten mistakes, with a specific correction

MistakeWhat it can hideCorrection
1. Ordering total metres onlyUnknown short-section quantities and end workList each section length and count
2. Specifying “warm white” onlyDifferent nominal CCT interpretationsRecord the chosen Kelvin value and configuration
3. Comparing watts as brightnessDifferent efficacy, optics and distributionCompare output data and the installed task
4. Machining before choosing the profileConnector or end cap will not fitApprove the complete cross-section
5. Using recess length as strip lengthCut interval or end allowance is missedCreate a permitted-unit cut schedule
6. Choosing a driver by total watts onlyWrong voltage, interface or derated capacityCheck the complete supply requirement
7. Ignoring shared cable currentAn upstream connection serves several branchesLabel loads before and after each split
8. Calling every dimmable part compatibleStartup or low-level operation is unverifiedIdentify exact equipment and demonstrate the chain
9. Extending a reel IP claim to finished endsUnreviewed cuts, connections and locationObtain the finished-assembly detail and relevant evidence
10. Approving a sample without its identityProduction cannot reproduce the accepted buildFreeze component and drawing references

Use the list to compare offers

Suppose offer A covers strip on reels while offer B covers cut sections with lead wires. The strip price alone cannot establish the cheaper delivered assembly. Put the same section schedule and supply scope in both requests before comparing totals.

Give every unresolved item a named owner: furniture designer, lighting supplier, installer or buyer. “To be confirmed” is useful only when someone is responsible for closing it before the affected work begins.

This is a specification-error checklist, not a ranking of brands or a claim about the most common ten defects in a measured dataset. For a complete procurement record, use the BOM and sample-approval guides.